S.No. | Name of Work | Value in Rs (Crores) |
---|---|---|
1 | Gandikota Lift Irrigation Scheme – Earthen Dam, Reservoir, Canal, Feeder Channels, head works, construction of field sums (Substantially Completed) |
475.00 |
2 | Handri Niva Sujala Sravanthi Project – Pump Houses | 145.00 |
3 | Pilot Micro Irrigation Project, Stage - I, II & III - a) Investigation and design of respective scope, b) Earth dam and Reservoir, c) Approach Canal, d) Pumphouse & forebay and all related Civil & Hydro-mechanical works, e) Canal and Distributory system, | 95.00 |
4 | Execution, Construction of pumping stations at Vasanthavada, Pedavagu Project and Bandarugudem Tank including Hydro-Mechanical works. | 42.00 |
5 | Laying of Pressure mains from Pedavagu Project to Bandarugudem tank including Surge protection against transient, formation of new tank at Bandarugudem and outfall structure, construction of staff quarters for staff at Pedavagu Project at Vasanthavada. | 29.35 |
6 | Laying of Pressure mains from Pedavagu Project to Bandarugudem tank including Surge protection against transient, formation of new tank at Bandarugudem and outfall structure, construction of staff quarters for staff at Pedavagu Project at Vasanthavada. | 20.22 |
7 | Restoration of K.E.T Bank in Divi Island of Krishna District and Restoration of Hamsala Out fall Sluice in Krishna District. | 27 |
8 | Construction of ancillary works necessary for LI-01 twin box culverts pressure mains crossing Railway lines. | 15 |
9 | Construction of Boundary Wall for Bramhani Industries Limited | 14.52 |
10 | Construction of approaches to the ROB at KM 19/8 of Kathipudi – Pamarru section of NH-214 in Kakinada Division in A.P | 19 |
11 | Modernisation of Mylavaram north canal (Package-90) & Modernisation of Mylavaram south canal (Package-91) | 90.31 |
12 | Package No.42 - Construction of pick up wier and regulator near Kristipadu village, excavation and formation of Yadiki canal system and excavation | 48.47 |
13 | Raising and widening of Godavari flood banks | 54.74 |
14 | Package No. 48A/06-07 Additional Investigation, Design, Preparation of Estimates and earth work excavation for widening of GNSS Flood Flow Canal - II from Owk Reservoir to Gandikota Reservoir from Km.15.874/16.500 to 32.520 /34.100% (Length:16.02Km) (60% of Rs.73,60 ,00 ,000) | 44.16 |
15 | Construction of Pump House in HNSS Phase II - Madanapalli P1, P2, P4, P5, P6, P7, P8, P9, P10, P11, P13, and P14. | 189.00 |
16 | Handriniva Sujala Sravanthi. | 86 |
S.No. | Name of Work | Value in Rs (Crores) |
---|---|---|
1 | Saddle Dam 'E' & 'F' of Indira Sagar Project (Polavaram Project) (60% of Rs.790000000 ) | 79 |
2 | Package No. HNSS Phase II/9 Investigation, preparation of HP's design, excavation, construction of CM & CD works of HNSS, man canal from KM 340.00 to KM 360.00 excluding tunnel from 358.500 to 360.00 under HNSS phase II in Ananthapur District (60% of Rs.75,49,00,000) | 45.29 |
3 | Package No. CEP/KDP/LI - 92A/07-08 & 93A/07-08 Providing lift & irrigation facilities under lift scheme to left over lands with in and near by the general boundary of Pulivendula Branch Canal on both sides from Km 0/0 to 35.025 & 35.025 to 68.00 and formation of distributory system | 56.74 |
4 | Package No.03 : Dummugudem NSP link canal to lift water from River Godavari to Nagarjunasagar Tail Pond - EWE & FE of Gravity canal to carry 24000 cusecs | 278.00 |
5 | Dr. B.R. Ambedkar Pranahita–Chevella Sujala Sravanthi Package No. 246 | 937.33 |
6 | AVR HNSS Phase-II: Investigation, Preparation of hydraulic particulars, design, drawings, earthwork excavation of approach canal @ km. 522.500 of AVR HNSS Main Canal to Sreenivasapuram Reservoir | 265.22 |
7 | Kanhar Spilway Aqueduct, Canal & tunnel, Uttar Pradesh | 421 |
8 | Mahan Main Canal, Sidhi District, Madhya Pradesh | 90 |
9 | Vattaluru Reservoir, Kadapa District, Andhra Pradesh | 97.97 |
10 | H. L. B. over River Kathojodi at Cuttak, Orissa | 99.23 |
11 | Construction of H. L. B. across River Godavari and its approaches, Maharashtra & Kaleshwaram in A.P. | 167.14 |
12 | Teonthar Lift Canal under Bansagar Project Rewa, Madhya Pradesh | 96.32 |
13 | Pench Diversion Project, Madhya Pradesh | 107.87 |
14 | Construction Of Maliya Branch Canal, Gujarat | 104.74 |
15 | Construction of Kharagoda Branch Canal, Gujarat | 51.14 |
16 | Execution of Nagod (Satna) Branch Canal from Km. 83.00 to 113.00 km of Bargi Diversion Project, Madhya Pradesh | 101.00 |
17 | Execution of Vijayraghavgarh Branch Canal from Km. 0.00 to 57.170 km and Pilongy Distributory, Madhya Pradesh | 176.00 |
18 | Provision of Main Road and services near Vishakhapatnam | 50.64 |
19 | Construction of Bhaoni Dam Project” in District Lalitpur, Uttar Pradesh | 218.16 |
20 | Other Misc. works (value less than 10 crores ) in various places in Andhra Pradesh | 150.00 |
S.No. | Name of Work | Value in Rs (Crores) |
---|---|---|
1 | Construction of 5 Nos. minors of Left Bank main Canal, Nandna Distributory (0.00 Km. to 36.0 Km.) , Hardua Distributory (0.00 Km. to 13.50 Km) and its network system, (Length & structures may vary to achieve optimum command area) including 988 Nos. Hydraulic, road structures & aqueduct as per Topographical requirement, lining of Nandna Distributory (0.00 Km. to 36.0 Km.), its Khairghat sub distributory (0.0 km to 10.01km) & Hardua Distributory (0.00 Km. to 13.50 Km) , its Mandwa sub distributory (0.0 km to 24.50 km). This work also includes Finalization of detailed Alignment by survey of distributaries, minors, & all structures, providing & fixing of colaba (Out let) down to 40 Ha. Chak of 18541.00 Ha. of command area on TURNKEY BASIS. | 126.87 |
2 | Construction of 16 Nos. minor of Right Bank main Canal, Dhamaniya Distributory 0.00 Km. to 13.20 Km. & Tail Distributory 0.00 Km. to 51 Km. length may vary to achieve optimum command area including 755 Nos. Hydraulic, road structures & aqueduct as per Topographical requirement, lining of Dhamaniya (0.00 Km. to 13.20 Km.) & Tail Distributory (0.00 Km. to 51 Km.). This work also includes Finalization of detailed Alignment by survey of distributaries, minors, & all structures, providing & fixing of colaba (Out let) down to 40 Ha. Chak of 13046.00 Ha. of command area on TURNKEY BASIS. | 73.81 |