Projects

Upcoming Projects
S.No.  Name of Work Value in Rs (Crores)
1 Construction of 5 Nos. minors of Left Bank main Canal, Nandna Distributory (0.00 Km. to 36.0 Km.) , Hardua Distributory (0.00 Km. to 13.50 Km) and its network system, (Length & structures may vary to achieve optimum command area) including 988 Nos. Hydraulic, road structures & aqueduct as per Topographical requirement, lining of Nandna Distributory (0.00 Km. to 36.0 Km.), its Khairghat sub distributory (0.0 km to 10.01km) & Hardua Distributory (0.00 Km. to 13.50 Km) , its Mandwa sub distributory (0.0 km to 24.50 km). This work also includes Finalization of detailed Alignment by survey of distributaries, minors, & all structures, providing & fixing of colaba (Out let) down to 40 Ha. Chak of 18541.00 Ha. of command area on TURNKEY BASIS. 126.87
2 Construction of 16 Nos. minor of Right Bank main Canal, Dhamaniya Distributory 0.00 Km. to 13.20 Km. & Tail Distributory 0.00 Km. to 51 Km. length may vary to achieve optimum command area including 755 Nos. Hydraulic, road structures & aqueduct as per Topographical requirement, lining of Dhamaniya (0.00 Km. to 13.20 Km.) & Tail Distributory (0.00 Km. to 51 Km.). This work also includes Finalization of detailed Alignment by survey of distributaries, minors, & all structures, providing & fixing of colaba (Out let) down to 40 Ha. Chak of 13046.00 Ha. of command area on TURNKEY BASIS. 73.81